The existing 22-year-old lot had failed completely along the north half — alligator cracking, three recurring potholes, and a drainage problem that caused water to pool near the entrance during winter rains. The client had been patching for two years without resolution.
We performed a full assessment and identified that the base had failed in the northern quadrant due to a combination of clay soil movement and a cracked stormwater drain. The solution required full-depth removal (4 inches asphalt + 6 inches failed base) in the problem area, stormwater drain repair, clay stabilization with lime treatment, and 8 inches of new compacted base rock. The southern half, where the base was still sound, received a 2-inch mill and overlay.
The project delivered a seamless, fully drained lot with new ADA-compliant striping, fresh sealant, and wheel stops. The drainage redesign diverted water to two existing catch basins that the previous contractor had ignored. The owner reported zero standing water after the first winter rain.